[Tavern-Talk] Trust Talk - Trust Objects and Purposes Series: Construction of the Vehicular Approach Road up to the Top of Meherabad Hill
Tavern-talk
tavern at ambppct.org
Tue Jul 21 06:22:11 GMT 2009
Trust Objects and Purposes Series: Construction of the Vehicular
Approach Road up to the Top of Meherabad Hill
(This is the ninth article in the Trust Objects and Purposes series.)
This article discusses the construction of the all-weather vehicular
approach road up to the top of Meherabad Hill. You can view the previous
articles, which are listed on the bottom of the page, at:
http://www.ambppct.org/trust/development-plan.php
The Trust Deed states:
"(F) In the course of developments according to the availability of
funds, preference shall be given to objects and works in the following
order . . .
(iv) All-weather vehicular approach road right up to the top of
Meherabad Hill."
When the Trust Deed was written in 1959, only a small piece of land on
Meherabad Hill was owned by the Trust. In order to be able to construct
the approach road, it was necessary for the Trust to acquire more land.
Over the years, the Trust acquired the necessary land, and Bhauji
enlisted the help of the government to get the project done. Through his
legal expertise, Bhauji brought the road construction project "under the
Law," as he would say.
In the late seventies, Padri supervised the road-building. He was the
main engineer on the project, and Ted Judson assisted him. Padri and Ted
designed the road, making sure that the alignment was right and ensuring
that the road was properly built so that all vehicles could negotiate
the ascent. Government workers did the digging, cutting, and filling.
Peter Nordeen brought a level transit from the States when he came to
live at Meherabad, and the men used this to shoot the levels for the
road bed. Besides Padri, Ted, and Peter, residents Eric Nadel and Alan
Wagner were also there on the day of laying out the road bed. Excavation
of rock and filling was required, which was done by local people. Of
course, Padri commanded great respect from all the local people, and
there was no problem in their taking directions from him. Padri would
visit the site from time to time to make sure the work was proceeding
properly. At that time there were few mature trees at Meherabad, so most
of the work site could be seen from Padri's verandah. In 1979, the work
on the approach road was finished, except for the paving. The road bed
was allowed to settle before it was ultimately paved.
During the construction of the road, workers discovered the location of
the Panchvati Cave, a man-made cave where Baba had secluded Himself for
a period of time in November 1930. The cave had been dug out on Baba's
order by Pendu, Chhagan, Sailor, and Beram, under Jal's supervision. The
work took a total of forty days to complete. They cleared out a deep pit
and covered it over with tin sheets. Opposite this pit, a raised earthen
seat was created where the mandali would sit in the evening. Baba was in
Bijapur while the work was being done. He returned to Meherabad when the
cave was complete and began His seclusion there on 15 November 1930.
Subsequently, the cave was covered over, and its exact location remained
something of a mystery until the road-building project got underway in
the nineteen seventies. The Trust has since placed a marker to designate
the location of the cave for pilgrims.
At the 80th meeting of the Board of Trustees, on 17th March 1991, per
Resolution 10, the Trustees sanctioned the paving of the road. In
preparation, Ted Judson discussed this part of the project with Sri
Syamala Rao of Vizakhapalnam, a retired civil engineer from the Andhra
Government Road Building Department. Mr. Rao possessed the requisite
technical expertise, and it was felt that his knowledge would be
helpful. Mr. Rao himself volunteered to supervise the project.
On 3rd October 1991, Jal wrote to Mr. Rao:
"As you have so lovingly offered to help and supervise this project, we
would like you to come to Meherbad as early as possible so that we may
meet the contractors and discuss with them your requirements . . ."
Consequently, Mr. Rao and his wife came to stay at Lower Meherabad for a
few months and contributed their time and energy to the completion of
this most important project.
On 1st November 1991, the contract for the paving of the road was
signed. The goal was to finish the work before Amartithi at the end of
January 1992, when large numbers of pilgrims would come to take darshan
at Beloved Baba's Samadhi. By Baba's Grace, this deadline was met. On
12th January, 1992, the Trustees received a message from the contractor,
V.Y. Bhandare that the road at Upper Meherabad had been "successfully
completed."
The approach road to the top of the Hill has stood the test of time.
Through all seasons, wet or dry, to this day it continues to provide a
comfortable and scenic way for pilgrims to ascend the Hill, whether by
vehicle or on foot.
The construction of the vehicular approach road to the top of Meherabad
Hill marks only the beginning of the development of the road network
that will be needed around Meherabad. Much work remains to be done. A
network of roads has been designed by the Trust and approved by the
government and, as it is necessary to develop these roads, the Trust
will do so.
****************************************************************************
The next article in this series will deal with the fifth object
enumerated in the Trust deed: maintenance of the existing cemetery for
female disciples to the west of the Tomb proper and provision for the
burial of the physical body at the spot already dug out, of Adi K.
Irani’s mother Gulmai Kaikhushru Irani after her death.
More information about the Tavern-Talk
mailing list